All articles
2026-08-21
How to Size a UPS for Hospital and Data Centre Critical Loads
How to size an uninterruptible power supply for hospital and data centre critical loads in Saudi Arabia, covering power factor, runtime, battery chemistry, and N+1 versus 2N redundancy.
2026-08-21
Solar Plus Battery Storage Economics for Saudi Commercial Facilities
What actually drives solar plus battery storage payback for Saudi commercial facilities: tariff structure, self-consumption share, cell temperature derating, soiling losses, and when storage earns its cost.
2026-08-21
SEC and SASO Product Qualification in Saudi Arabia: What Actually Gets Checked
How electrical equipment gets qualified for use on Saudi Electricity Company networks and cleared through SASO/SABER at customs, what documentation each gate actually checks, and why qualification status changes a procurement timeline.
2026-08-21
Obstruction Lighting Compliance for Tall Structures and Cranes in Saudi Arabia
When obstacle lighting is required in Saudi Arabia, how intensity class is chosen, what an aeronautical study determines, and how ICAO Annex 14 is applied through GACA for towers, tall structures, and cranes.
2026-08-21
NFPA 99 Isolated Power in Saudi Hospitals: What Wet Locations Actually Require
What NFPA 99 requires for isolated power in Category 1 wet procedure locations in Saudi hospitals, how a line isolation monitor works, and what consultants typically put in the spec.
2026-08-21
Medium Voltage Switchgear Lead Times in Saudi Arabia and How to Protect Your Schedule
Why MV switchgear is usually the critical path item on a Saudi power project, what drives factory lead times, and how to sequence ordering when the programme is already tight.
2026-08-21
Diesel Generator Sizing and ATS Selection for Saudi Facilities
How to size a diesel generator and pick the right automatic transfer switch for a Saudi facility, covering step versus block loading, ambient derating, and NFPA 110 requirements for hospitals.
2026-08-21
What Does EV Charger Installation Cost in Saudi Arabia? Market Ranges and Cost Drivers
What drives EV charger installation cost in Saudi Arabia: charger type and power rating, civil and cable works, distance to the electrical board, spare supply capacity, load management versus a supply upgrade, and the OCPP back end.
