SEC lists three low-voltage levels in Saudi Arabia: 400/230 V, 380/220 V and 220/127 V. The Grid Code gives 60 Hz for the transmission system. SEC's solar standard, quoting the Distribution Code, gives voltage ranges of plus or minus 5% in normal operation. The SERA guide supplies loads up to 4 MVA of simultaneous demand at low voltage. Each of the 108 rows cites its clause.

Rows
108
Version
1.0
Last verified
2026-11-11
Licence
CC BY 4.0
Download the data:CSVCSV (Arabic)JSON

This is a working reference for engineers, consultants and contractors who size or specify electrical equipment for a site in Saudi Arabia. Each row is one requirement or one fact. Each row names the clause or table it comes from, links to the published document it was checked against, and carries the date of that check.

The 108 rows fall in 9 groups: supply voltages and frequency, permitted variation, power factor and power quality, connection rules and supply service, breaker and load tables at 400/230 V, line clearances, small-scale solar and renewable self-consumption, the Saudi Electricity Company (SEC) unit substation specification with the SDMS numbers it cites, and site service conditions.

The values come from the Saudi Arabian Grid Code, the SERA electricity service guide, two SERA frameworks for solar, and a technical standard and a material specification published by SEC. The Saudi Arabian Distribution Code is not in this version. The method note says why.

How to cite

NLS Power (2026). Saudi Electricity Supply and Connection Requirements Dataset, version 1.0. https://nlspower.com/en/data/saudi-electricity-supply-requirements. Licensed under CC BY 4.0.

Page URL: https://nlspower.com/en/data/saudi-electricity-supply-requirements

Supply voltages and frequency (8)

Nominal low, medium and transmission voltages, supply configurations and the 60 Hz system frequency.

Saudi Electricity Supply and Connection Requirements Dataset: Supply voltages and frequency
IDRequirementValueNumberUnitClauseSourceVerified
V-01Low voltage nominal levels in KSA (solar standard)Low voltage400/230 V, 380/220 V and 220/127 V. Low voltage means a nominal voltage below 1 kV AC (or 1.5 kV DC).400/230VClause 4, Distribution System / NetworkSEC solar standard, Clause 4, Distribution System / Network, PDF page 82026-11-11
V-02Medium voltage nominal levels (solar standard)Medium voltage13.8 kV and 33 kV. Medium voltage covers nominal voltages from 1 kV AC up to 36 kV.13.8, 33kVClause 4, Distribution System / NetworkSEC solar standard, Clause 4, Distribution System / Network, PDF page 82026-11-11
V-03Transmission system nominal voltagesTransmission110 kV, 115 kV, 132 kV, 230 kV and 380 kV.110, 115, 132, 230, 380kVClause 2.4.3Grid Code, Clause 2.4.3, PDF page 322026-11-11
V-04Nominal frequency and phase rotationLow voltageMedium voltageTransmission60 Hz, with R-Y-B counter-clockwise phase rotation, on the transmission system.60HzClause 2.4.2.1Grid Code, Clause 2.4.2.1, PDF page 312026-11-11
V-05LV supply configurations in the SEC networkLow voltageThree-phase four-wire 400/230 V; three-phase four-wire 220/127 V; three-phase three-wire 220 V.The standard says these have to be considered when choosing inverters and equipment for a site on the LV network.Annex CSEC solar standard, Annex C, PDF pages 40 and 412026-11-11
V-06Upgrade of a 220/127 V supply to 400/230 VLow voltageA 127 V single-phase inverter can no longer be used after the upgrade. A 230 V inverter can be moved to a phase-to-neutral connection and reconfigured. The consumer bears the cost of modification or replacement.Clause 6.9.7.5, DisclaimerSEC solar standard, Clause 6.9.7.5, Disclaimer, PDF page 282026-11-11
V-07Unit substation LV rating (SEC specification)Low voltage400/231 V on the secondary side, for unit substations of 500, 1000 and 1500 kVA.The specification writes 400/231 V here and in its dimension tables, while the same utility writes 400/230 V elsewhere.400/231VClause 7, Data Schedule, item 3SEC 56-SDMS-07, Clause 7, Data Schedule, item 3, PDF page 112026-11-11
V-08Definition of standard voltageLow voltageMedium voltageThe voltage set for transmitting and distributing electric power, as approved in the transmission and distribution codes.Article 1, definitionsService guide, Article 1, definitions, PDF page 82026-11-11

Permitted variation and operating ranges (12)

Voltage and frequency bands in normal and exceptional operation, and the windows small solar systems must ride through.

Saudi Electricity Supply and Connection Requirements Dataset: Permitted variation and operating ranges
IDRequirementValueNumberUnitClauseSourceVerified
F-01Normal frequency band, transmission gridTransmissionThe transmission operator maintains frequency between 59.9 and 60.1 Hz in normal operation.59.9 to 60.1HzClause 2.4.2.1Grid Code, Clause 2.4.2.1, PDF page 312026-11-11
F-02Exceptional frequency limitsTransmissionSystem frequency could rise to 62.5 Hz or fall to 57.0 Hz in exceptional circumstances.57.0 to 62.5HzClause 2.4.2.2Grid Code, Clause 2.4.2.2, PDF page 312026-11-11
F-03Generator operation time by frequency bandTransmissionContinuous: 58.8 to 60.5 Hz. For 30 minutes: 57.5 to 58.7 Hz and 60.6 to 61.5 Hz. For 30 seconds: 57.0 to 57.4 Hz and 61.6 to 62.5 Hz.The Grid Code table is written for generator plant. The SEC solar standard (Table 1) repeats the same bands for small solar systems.58.8 to 60.5HzClause 2.4.2.2, tableGrid Code, Clause 2.4.2.2, table, PDF page 312026-11-11
F-04Normal voltage range, 110 kV to 380 kVTransmissionWithin plus or minus 5% of nominal voltage under normal conditions, at any point of the transmission system.5%Clause 2.4.3Grid Code, Clause 2.4.3, PDF page 322026-11-11
F-05Exceptional voltage range, 110 kV to 380 kVTransmissionPlus or minus 10% of nominal voltage. The maximum over-voltage should not be exceeded for more than 30 minutes.10%Clause 2.4.3Grid Code, Clause 2.4.3, PDF page 322026-11-11
F-06Voltage range at 400/230 V in normal operationLow voltageLowest 380/218.5 V, highest 420/241.5 V (plus or minus 5%).The standard says the intervals are those specified in the Distribution Code.380 to 420VTable 3 (solar standard), clause 6.9.7.1SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 272026-11-11
F-07Voltage range at 380/220 V in normal operationLow voltageLowest 360/209 V, highest 400/231 V.Calculated by us, not printed: 5% of 380 V is 19 V, which gives 361 V and 399 V, so the printed values are rounded.360 to 400VTable 3 (solar standard), clause 6.9.7.1SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 272026-11-11
F-08Voltage range at 220/127 V in normal operationLow voltageLowest 209/120 V, highest 231/134 V.209 to 231VTable 3 (solar standard), clause 6.9.7.1SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 272026-11-11
F-09Voltage range at 13.8 kV and 33 kV in normal operationMedium voltage13.8 kV: lowest 13.1 kV, highest 14.5 kV. 33 kV: lowest 31.4 kV, highest 34.7 kV.Table 3 (solar standard), clause 6.9.7.1SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 272026-11-11
F-10Operating range a small solar system must ride throughLow voltageMedium voltageVoltage 90 to 110% of nominal at the connection point, continuous. The frequency bands of row F-03 also apply.90 to 110%Clause 6.5, Table 2SEC solar standard, Clause 6.5, Table 2, PDF page 162026-11-11
F-11Window for connecting or reconnecting a solar systemLow voltageMedium voltageFrequency 59.5 to 60.05 Hz and voltage 95 to 105% of nominal, held for at least 300 seconds.300sClause 6.9.1 and 6.9.3SEC solar standard, Clause 6.9.1 and 6.9.3, PDF page 232026-11-11
F-12Voltage step when a solar system connects or disconnectsLow voltageMedium voltageSynchronizing must not cause a transient voltage change above 4% of nominal. Connecting or disconnecting must not cause voltage variations above 3% of the rated voltage.3 to 4%Clauses 6.9.1 and 6.9.7.2SEC solar standard, Clauses 6.9.1 (PDF page 23) and 6.9.7.2 (PDF page 27)2026-11-11

Power factor and power quality (10)

Power factor thresholds, harmonics, unbalance, flicker and related limits. Thresholds only, no tariff amounts.

Saudi Electricity Supply and Connection Requirements Dataset: Power factor and power quality
IDRequirementValueNumberUnitClauseSourceVerified
Q-01Voltage harmonics limit at the transmission connection pointTransmissionTotal harmonic distortion of 1.5%, with no individual harmonic above 1%, when the connection agreement sets no limit.The clause applies to plant and apparatus connected to the transmission system. Distribution-level limits are in the Distribution Code, which is not covered by this dataset.1.5% THDClause 2.4.4.2Grid Code, Clause 2.4.4.2, PDF page 322026-11-11
Q-02Voltage unbalance caused by a userTransmissionA user facility must not cause phase-to-phase unbalance to exceed 1% at the connection point.1%Clause 2.4.5Grid Code, Clause 2.4.5, PDF page 332026-11-11
Q-03Voltage fluctuation from a fluctuating demandTransmissionRepeated step changes must not exceed 1% of nominal voltage. Other large excursions may be allowed up to 3% if they pose no risk.1 to 3%Clause 2.4.6.1Grid Code, Clause 2.4.6.1, PDF page 332026-11-11
Q-04Flicker severity limitsTransmissionPst not above 0.8 and Plt not above 0.6, both 95th percentile values measured over one week.0.8, 0.6Pst, PltClause 2.4.6.2Grid Code, Clause 2.4.6.2, PDF page 332026-11-11
Q-05Power factor of distribution entities and directly connected customers with contracted load above 1 MVALow voltageMedium voltageTransmissionDistribution entities and directly connected customers with contracted load above 1.0 MVA should take all precautionary measures to maintain 85% lagging power factor. Their minimum allowable power factor will be 90% lagging after five years from 21-10-1433, and 95% lagging after ten years from the said date.The clause gives the date without a calendar label; we read it as Hijri. Derived by us, not printed: adding five and ten years gives 21-10-1438 H and 21-10-1443 H. The clause names distribution entities and directly connected customers. Where the numeric power factor limit for other sites on the distribution network sits is in clause DPC2.4 of the Distribution Code, which this dataset does not cover (row Q-07). The clause also says a tariff applies to excess reactive power under SERA Board Resolution 2/27/23. The tariff amount is left out of this dataset.0.85, 0.90, 0.95laggingClause 2.5.6.4Grid Code, Clause 2.5.6.4, PDF page 502026-11-11
Q-06Power factor range of synchronous generatorsTransmissionRated active power at any point between 85% lagging and 95% capacitive at the generating unit terminals, unless the grid operator agrees otherwise.0.85 lag to 0.95 leadpower factorClause 2.5.5.1Grid Code, Clause 2.5.5.1, PDF page 382026-11-11
Q-07Power factor limit for a site with a solar systemLow voltageMedium voltageMust meet the power factor limits of the Distribution Code (clause DPC2.4), measured at the connection point.This dataset gives no numeric limit from DPC2.4: the official text of the Distribution Code could not be opened for the checking of this version.Clause 6.9.6SEC solar standard, Clause 6.9.6, PDF page 262026-11-11
Q-08Harmonic limits for MV-connected solar systemsMedium voltageHarmonic and interharmonic voltages must not exceed the planning levels in the Distribution Code, clause DPC2.3.Clause 6.9.7.3SEC solar standard, Clause 6.9.7.3, PDF page 272026-11-11
Q-09DC injection limitLow voltageMedium voltageSolar systems must not inject DC current. The requirement is met if the injected DC component is below 0.5% of rated AC current.0.5% of rated AC currentClause 6.9.7.4SEC solar standard, Clause 6.9.7.4, PDF page 272026-11-11
Q-10Current imbalance from single-phase solar invertersLow voltageUp to 11 kW, single or two-phase inverters may be used if spread equally across phases, with the imbalance between two phases below 16 A (3.52 kW at 220 V). Above that, use three-phase inverters, or single or two-phase inverters joined by a communication link that restores the power balance between the phases.16AClause 6.9.7.5SEC solar standard, Clause 6.9.7.5, PDF page 272026-11-11

Connection rules and supply service (18)

Which voltage a load is supplied at, when a substation room is needed, time limits, documents, meter locations and temporary supply.

Saudi Electricity Supply and Connection Requirements Dataset: Connection rules and supply service
IDRequirementValueNumberUnitClauseSourceVerified
C-01Supply voltage class by simultaneous demand loadLow voltageMedium voltageSupply rules depend on the simultaneous demand load: up to 4 MVA; above 4 MVA and up to 25 MVA; above 25 MVA.Source: the Arabic text of the guide (8th edition). The English wording is ours.4, 25MVAArticle 11Service guide, Article 11, PDF page 192026-11-11
C-02Loads supplied at low voltageLow voltageLoads whose simultaneous demand does not exceed 4 MVA are supplied at low distribution voltage.4MVAArticle 11, clause 11-1-1Service guide, Article 11, clause 11-1-1, PDF page 192026-11-11
C-03Loads supplied at medium voltageMedium voltageLoads above 4 MVA and up to 25 MVA are supplied at medium distribution voltage.4 to 25MVAArticle 11, clause 11-2-1Service guide, Article 11, clause 11-2-1, PDF page 212026-11-11
C-04Loads supplied at transmission voltageTransmissionLoads above 25 MVA and up to 120 MVA are supplied at high transmission voltage. Loads above 120 MVA are supplied at high or extra-high transmission voltage.25, 120MVAArticle 11, clauses 11-3-1 and 11-3-2Service guide, Article 11, clauses 11-3-1 and 11-3-2, PDF page 222026-11-11
C-05Exception: MV supply for loads above 25 MVAMedium voltageThe provider may supply such a load at medium voltage from one of its substations if it does not reduce supply reliability or delay supply to consumers with loads below 25 MVA in the same area. The customer shares the substation cost in proportion to its demand against the safe capacity.25MVAArticle 11, clause 11-3-3Service guide, Article 11, clause 11-3-3, PDF page 222026-11-11
C-06When the customer must provide a substation roomLow voltageWhen the load for the whole built area of the premises (per the building permit) exceeds 166 kVA, whatever the breaker loads installed by the provider. The customer provides the site inside the plot for the transformers and equipment.Derived from the table, not printed in this clause: 166 kVA is the last printed row for a 200 A breaker in the residential table (1500 m2), see row L-09.166kVAArticle 11, clause 11-1-7Service guide, Article 11, clause 11-1-7, PDF page 202026-11-11
C-07Conditions for the substation siteLow voltageOn an approved street. Area not more than 20 m2 per transformer. Matching the provider's approved drawings and specifications. Municipal approval of the site.20m2 per transformerArticle 11, clause 11-1-7 (a to d)Service guide, Article 11, clause 11-1-7 (a to d), PDF page 202026-11-11
C-08Customer substation at medium voltageMedium voltageThe customer builds its own transformation substation and is responsible for operating and maintaining it, in addition to building, operating and maintaining its own private network.Article 11, clause 11-2-5Service guide, Article 11, clause 11-2-5, PDF page 212026-11-11
C-09Provider operating a customer substationMedium voltageException: the provider operates and maintains it if the substation meets the provider's standard specifications, sits on the outer boundary of the plot with free access for the provider, and its equipment ownership passes to the provider. A customer who wants to keep ownership pays the provider a yearly charge set in the guide.The yearly charge is left out of this dataset because it is a payment term.Article 11, clause 11-2-6Service guide, Article 11, clause 11-2-6, PDF page 212026-11-11
C-10Time to connect after paying the connection chargeLow voltageThe provider connects a low voltage supply within 20 working days of the payment date, if there are no obstacles outside its control.20working daysArticle 10, clause 10-2Service guide, Article 10, clause 10-2, PDF page 192026-11-11
C-11Time to pay the connection chargeLow voltageMedium voltageThe applicant pays within 90 days of being notified. After that the provider may reassess the study and recalculate costs.The charge itself is set in Annex 3 of the guide and is not part of this dataset.90daysArticle 10, clause 10-4Service guide, Article 10, clause 10-4, PDF page 192026-11-11
C-12Small loads supplied without a meterLow voltageSmall fixed loads (units) of not more than 4 kVA are supplied from the nearest supply source. If technical obstacles stop a meter being fitted, they can be connected without one and consumption is then calculated under clause 36-3-3.4kVAArticle 12, clause 12-1Service guide, Article 12, clause 12-1, PDF page 232026-11-11
C-13Protection required for small loadsLow voltageA breaker against overload, short circuit and earth leakage, with a breaker earth leakage sensitivity of not less than 30 mA (as printed). At least one earth rod. A timer that cuts the circuit at each feed point so that units which need power only at night are limited to it.The printed wording is that the breaker sensitivity to earth leakage current must not be less than 30 mA. Check with the provider how it applies this to the device selected.not less than 30mAAnnex 6, Table 1 (small loads), items 5 to 7Service guide, Annex 6, Table 1 (small loads), items 5 to 7, PDF page 762026-11-11
C-14First documents for a new connection (items 1 to 4 of 11)Low voltageMedium voltageSigned connection agreement, coordination certificate from the provider, and a copy of the building permit. For mosques, approval of the Ministry of Islamic Affairs on payment of consumption bills.Annex 6, Table 1 (new connection), items 1 to 4Service guide, Annex 6, Table 1 (new connection), items 1 to 4, PDF page 762026-11-11
C-15Meter location for 1 to 8 metersLow voltageMeters go on the front fence from outside.1 to 8electricity metersAnnex 6, Table 5Service guide, Annex 6, Table 5, PDF page 772026-11-11
C-16Meter location for 9 to 20 metersLow voltageAt a location agreed with the provider on the side fence wall, provided the building has no front fence. If the customer cannot offer a side wall, a meter room is required.9 to 20electricity metersAnnex 6, Table 5Service guide, Annex 6, Table 5, PDF page 772026-11-11
C-17Meter room above 20 metersLow voltageThe customer must provide a meter room built to the provider's specifications.20electricity metersAnnex 6, Table 5Service guide, Annex 6, Table 5, PDF page 772026-11-11
C-18Temporary supply for constructionLow voltageTemporary meter of 30 A, increasable to no more than 10% of the total permanent load once the need is justified. A valid building permit or a lawful licence is required. Connection within 20 working days of payment for low voltage.30AArticle 13, clause 13-1-1; Annex 6, Table 2Service guide, Article 13, clause 13-1-1 (PDF page 23); Annex 6, Table 2 (PDF page 76)2026-11-11

Breaker size and load tables at 400/230 V (15)

The guide's indicative table linking breaker size, connected load and built area for residential and commercial buildings.

Saudi Electricity Supply and Connection Requirements Dataset: Breaker size and load tables at 400/230 V
IDRequirementValueNumberUnitClauseSourceVerified
L-01Suggested breaker 20 A at 400/230 V: connected load and built areaLow voltageTable rows for a 20 A breaker. Residential: from 3 kVA at 25 m2 (first row) to 16 kVA at 125 m2 (last row). Commercial: from 5 kVA at 25 m2 to 13 kVA at 75 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.20AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-02Suggested breaker 30 A at 400/230 V: connected load and built areaLow voltageTable rows for a 30 A breaker. Residential: from 17 kVA at 126 m2 (first row) to 22 kVA at 175 m2 (last row). Commercial: from 14 kVA at 76 m2 to 22 kVA at 125 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.30AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-03Suggested breaker 40 A at 400/230 V: connected load and built areaLow voltageTable rows for a 40 A breaker. Residential: from 23 kVA at 176 m2 (first row) to 32 kVA at 250 m2 (last row). Commercial: from 23 kVA at 126 m2 to 30 kVA at 175 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.40AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-04Suggested breaker 50 A at 400/230 V: connected load and built areaLow voltageTable rows for a 50 A breaker. Residential: from 33 kVA at 251 m2 (first row) to 40 kVA at 325 m2 (last row). Commercial: from 31 kVA at 176 m2 to 38 kVA at 225 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.50AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-05Suggested breaker 70 A at 400/230 V: connected load and built areaLow voltageTable rows for a 70 A breaker. Residential: from 41 kVA at 326 m2 (first row) to 56 kVA at 475 m2 (last row). Commercial: from 39 kVA at 226 m2 to 56 kVA at 325 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.70AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-06Suggested breaker 100 A at 400/230 V: connected load and built areaLow voltageTable rows for a 100 A breaker. Residential: from 57 kVA at 476 m2 (first row) to 82 kVA at 725 m2 (last row). Commercial: from 57 kVA at 326 m2 to 82 kVA at 475 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.100AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-07Suggested breaker 125 A at 400/230 V: connected load and built areaLow voltageTable rows for a 125 A breaker. Residential: from 83 kVA at 726 m2 (first row) to 101 kVA at 900 m2 (last row). Commercial: from 83 kVA at 476 m2 to 102 kVA at 600 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.125AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-08Suggested breaker 150 A at 400/230 V: connected load and built areaLow voltageTable rows for a 150 A breaker. Residential: from 102 kVA at 901 m2 (first row) to 125 kVA at 1125 m2 (last row). Commercial: from 103 kVA at 601 m2 to 124 kVA at 725 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.150AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-09Suggested breaker 200 A at 400/230 V: connected load and built areaLow voltageTable rows for a 200 A breaker. Residential: from 126 kVA at 1126 m2 (first row) to 166 kVA at 1500 m2 (last row). Commercial: from 125 kVA at 726 m2 to 166 kVA at 1000 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.200AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-10Suggested breaker 250 A at 400/230 V: connected load and built areaLow voltageTable rows for a 250 A breaker. Residential: from 167 kVA at 1501 m2 (first row) to 208 kVA at 1900 m2 (last row). Commercial: from 167 kVA at 1001 m2 to 192 kVA at 1125 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.250AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-11Suggested breaker 300 A at 400/230 V: connected load and built areaLow voltageTable rows for a 300 A breaker. Residential: from 209 kVA at 1901 m2 (first row) to 250 kVA at 2300 m2 (last row). Commercial: from 193 kVA at 1126 m2 to 239 kVA at 1400 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.300AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial)2026-11-11
L-12Suggested breaker 400 A at 400/230 V: connected load and built areaLow voltageTable rows for a 400 A breaker. Residential: from 251 kVA at 2301 m2 (first row) to 325 kVA at 3000 m2 (last row). Commercial: from 240 kVA at 1401 m2 to 316 kVA at 1850 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.400AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 71 (commercial)2026-11-11
L-13Suggested breaker 500 A at 400/230 V: connected load and built areaLow voltageTable rows for a 500 A breaker. Residential: from 326 kVA at 3001 m2 (first row) to 389 kVA at 3600 m2 (last row). Commercial: from 317 kVA at 1851 m2 to 393 kVA at 2300 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.500AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 71 (commercial)2026-11-11
L-14Suggested breaker 600 A at 400/230 V: connected load and built areaLow voltageTable rows for a 600 A breaker. Residential: from 390 kVA at 3601 m2 (first row) to 475 kVA at 4400 m2 (last row). Commercial: from 394 kVA at 2301 m2 to 461 kVA at 2700 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.600AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 71 (commercial)2026-11-11
L-15Suggested breaker 800 A at 400/230 V: connected load and built areaLow voltageTable rows for a 800 A breaker. Residential: from 476 kVA at 4401 m2 (first row) to 648 kVA at 6000 m2 (last row). Commercial: from 462 kVA at 2701 m2 to 640 kVA at 3800 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule.800AAnnex 4, guideline tables for 400/230 VService guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 72 (commercial)2026-11-11

Line clearances and corridors (7)

Vertical and horizontal clearances for distribution lines and the corridor width of transmission lines.

Saudi Electricity Supply and Connection Requirements Dataset: Line clearances and corridors
IDRequirementValueNumberUnitClauseSourceVerified
K-01Vertical clearance for 69 kV linesLow voltageMedium voltageLowest sag point of the line to the highest point of: building (or structure) 5 m, telephone line 3 m, railway 15 m, fast road 12 m, public road 12 m, agricultural road 12 m.mAnnex 11, Table 2Service guide, Annex 11, Table 2, PDF page 892026-11-11
K-02Vertical clearance for 34.5/33 kV linesLow voltageMedium voltageLowest sag point of the line to the highest point of: building (or structure) 4 m, telephone line 2 m, railway 8.5 m, fast road 12 m, public road 7 m, agricultural road 6.7 m.mAnnex 11, Table 2Service guide, Annex 11, Table 2, PDF page 892026-11-11
K-03Vertical clearance for 13.8 kV linesLow voltageMedium voltageLowest sag point of the line to the highest point of: building (or structure) 3 m, telephone line 2 m, railway 8.5 m, fast road 12 m, public road 7 m, agricultural road 6.7 m.mAnnex 11, Table 2Service guide, Annex 11, Table 2, PDF page 892026-11-11
K-04Vertical clearance for low voltage linesLow voltageMedium voltageLowest sag point of the line to the highest point of: building (or structure) 3 m, telephone line 1.2 m, railway 8.2 m, fast road 12 m, public road 6 m, agricultural road 5 m.mAnnex 11, Table 2Service guide, Annex 11, Table 2, PDF page 892026-11-11
K-05Horizontal clearance for 69 kV linesLow voltageMedium voltageFrom the pole centre line: building 6.3 m (to the nearest conductor), railway 25 m, fast road 18 m, ordinary or agricultural road 12 m.mAnnex 11, Table 3Service guide, Annex 11, Table 3, PDF page 892026-11-11
K-06Horizontal clearance for 34.5/33 kV, 13.8 kV and low voltage linesLow voltageMedium voltageFrom the pole centre line: building 2 m (to the nearest conductor), railway 15 m, fast road 15 m, ordinary or agricultural road 12 m. The same values apply at all three levels.mAnnex 11, Table 3Service guide, Annex 11, Table 3, PDF page 892026-11-11
K-07Transmission line corridor widthTransmission110, 115 and 132 kV: 15 to 50 m depending on tower type. 230 kV: 35 to 56 m. 380 kV: 50 to 85 m.mAnnex 11, Table 1Service guide, Annex 11, Table 1, PDF page 892026-11-11

Solar PV and renewable self-consumption (18)

Eligible sizes, meters, protection settings and connection duties for small-scale solar, and the self-consumption framework.

Saudi Electricity Supply and Connection Requirements Dataset: Solar PV and renewable self-consumption
IDRequirementValueNumberUnitClauseSourceVerified
S-01Interface protection: voltage default settingsLow voltageMedium voltageUndervoltage 27<: 90% of nominal, 0.4 s. 27<<: 40%, 0.3 s. Overvoltage 59>: 110%, 3 s. 59>>: 120%, 0.2 s. Used only when the utility has not given other settings.Annex B, Table 4SEC solar standard, Annex B, Table 4, PDF page 392026-11-11
S-02Interface protection: frequency default settingsLow voltageMedium voltageOverfrequency 81>>: 62.5 Hz, 0.1 s. Underfrequency 81<: 57.5 Hz, 1800 s. 81<<: 57 Hz, 30 s.Annex B, Table 4SEC solar standard, Annex B, Table 4, PDF page 392026-11-11
S-03Loss of mains protection: default settings and trip timeLow voltageMedium voltageVector shift 12 degrees and rate of change of frequency 2.5 Hz per second. Islanding must be detected and energising stopped within two seconds, unless the utility specifies otherwise.2sClause 6.9.4; Annex B, Table 5SEC solar standard, Clause 6.9.4, PDF page 25; Annex B, Table 5, PDF page 392026-11-11
S-04Small solar systems up to 11 kWLow voltageMedium voltageThe interface protection and interface switch may be built into the inverter. Three-phase inverters are the rule; on the LV network single or two-phase inverters are permitted up to 11 kW.11kWClause 6.9.4 and 6.9.7.5SEC solar standard, Clause 6.9.4, PDF page 24; clause 6.9.7.5, PDF page 272026-11-11
S-05Extra duties above 11 kWLow voltageMedium voltageLow voltage ride through capability, a remote disconnection input, a remote active-power limitation input, bidirectional communication, and an uninterruptible supply for the interface protection.11kWClauses 6.6.1, 6.7.3, 6.9.2, 6.9.4, 6.9.5SEC solar standard, Clauses 6.6.1 (PDF page 16), 6.7.3 (page 19), 6.9.2 (page 23), 6.9.4 (page 24), 6.9.5 (page 26)2026-11-11
S-06Backup switch above 20 kWLow voltageMedium voltageThe interface protection must also act on a second (backup) switch with a delay if the interface switch fails to open. After a backup trip only manual reclosure is possible.20kWClause 6.9.4SEC solar standard, Clause 6.9.4, PDF page 242026-11-11
S-07Reactive power capability at full outputLow voltageMedium voltageAt rated active power, the inverter must reach a power factor of 0.95 in either direction (inductive or capacitive).0.95power factorClause 6.8.1, footnote 4SEC solar standard, Clause 6.8.1, footnote 4, PDF page 192026-11-11
S-08Default reactive power settingLow voltageMedium voltageThe utility tells the owner which reactive power mode to use. If it does not specify, the default set point is cos phi 1 in fixed power factor mode (0 in fixed Q mode). In the power-related mode the defaults are cos phi 1 at zero and at half of nominal power, and 0.95 at nominal power.1cos phiClauses 6.8.2.1 and 6.8.2.2SEC solar standard, Clauses 6.8.2.1 (PDF page 20) and 6.8.2.2 (PDF page 21)2026-11-11
S-09Active power response to over-frequencyLow voltageMedium voltageThreshold settable at least between 60 and 62 Hz, default 60.2 Hz. Droop adjustable from 2% to 8%, default 3.83%.60.2HzClause 6.7.1SEC solar standard, Clause 6.7.1, PDF page 172026-11-11
S-10Capacity limit for one premises (small-scale solar PV)Low voltageMedium voltageNot more than 2 MW and not less than 1 kW in one premises.Source: the Arabic text of the framework (ERD-TA-012, V02/19, Muharram 1442 H). The English wording is ours.1 to 2000kWClause 5-1(c)Small-scale solar framework, Clause 5-1(c), PDF page 92026-11-11
S-11Combined capacity limit for one consumerLow voltageMedium voltageNot more than 5 MW in total across premises owned by the same eligible consumer in the supply area of one electricity department.5MWClause 5-1(d)Small-scale solar framework, Clause 5-1(d), PDF page 92026-11-11
S-12Solar capacity against contracted loadLow voltageMedium voltageThe maximum connected capacity of small solar systems in a premises must not exceed its contracted load.The 2023 self-consumption framework (clause 5.1 c) states the same rule for larger systems.Clause 5-2Small-scale solar framework, Clause 5-2, PDF page 92026-11-11
S-13Second meter for solar outputLow voltageMedium voltageA second meter for the solar output is required when the system in one premises is above 100 kW. The utility supplies and installs it and the consumer bears its cost.The SEC solar standard (clause 6.10) repeats the 100 kW threshold.100kWClause 6(b)Small-scale solar framework, Clause 6(b), PDF page 102026-11-11
S-14Grid impact study thresholdLow voltageMedium voltageAbove 50 kW the distribution provider may ask for detailed planning data to run impact studies, and may reject a connection if the study shows it would cause problems on the network. The rejection must give reasons and the consumer must be given time to correct the situation.50kWClause 8-2-2Small-scale solar framework, Clause 8-2-2, PDF page 132026-11-11
S-15Scope of the self-consumption frameworkLow voltageMedium voltageRenewable generation systems above 1 kW and up to 30 MW for self-consumption on the premises, except solar PV up to 2 MW, which falls under the small-scale solar framework.Version 2 (June 2023) is an English translation of the Arabic original. The Arabic text prevails in case of conflict.30MWClauses 3.2 and 3.4Self-consumption framework, Clauses 3.2 and 3.4, PDF page 92026-11-11
S-16Cap on total self-consumption capacity in a distribution areaLow voltageMedium voltageCapacity connected under net billing on a provider's LV and MV networks must not exceed 3% of the previous year's peak load of its operating area. Approved requests above the cap wait until the next year.3% of previous-year peak loadClauses 11.2.1 and 11.2.3Self-consumption framework, Clause 11.2.1, PDF page 18; clause 11.2.3, PDF page 192026-11-11
S-17Storage added to a renewable systemLow voltageMedium voltageAllowed if combined with the renewable system, if its power does not exceed the system's maximum connected capacity, if it serves on-site self-consumption, and if a grid-connected unit is run to reduce load-generation imbalance.Clause 11.4.1Self-consumption framework, Clause 11.4.1, PDF page 192026-11-11
S-18Time limits in the connection processLow voltageMedium voltageThe provider countersigns the connection agreement within 10 business days of receiving the signed copies and fees. It gives at least 2 days notice before inspecting a system. Re-inspection is agreed within 5 business days of the request.10, 2, 5daysAnnex 3 clause 5.1(e); Annex 1 clauses 4-1, 4-2Self-consumption framework, Annex 3 clause 5.1(e), PDF page 30; Annex 1 clauses 4-1 and 4-2, PDF page 212026-11-11

Unit substation specification and SDMS numbers (15)

Ratings, sizes and test requirements of the utility's unit substation, and the SDMS numbers it cites.

Saudi Electricity Supply and Connection Requirements Dataset: Unit substation specification and SDMS numbers
IDRequirementValueNumberUnitClauseSourceVerified
U-01Unit substation ratingsMedium voltageLow voltageNominal ratings 500, 1000 and 1500 kVA. MV side 13.8 kV or 36 kV. LV side 400/231 V.The title says "up to 36 kV". The dimension tables cover 13.8 kV and 36 kV only. SEC writes 400/231 V in this specification and 400/230 V in other documents, for example the transformer specification in row U-11.500, 1000, 1500kVAClause 7, Data Schedule 1, items 1 to 3SEC 56-SDMS-07, Clause 7, Data Schedule 1, items 1 to 3, PDF page 112026-11-11
U-02What a unit substation containsMedium voltageLow voltageA power transformer and an LV distribution panel in one transportable unit on a common skid. The MV switchgear and the ring main unit are not part of it.Clauses 1 and 4.2.1.1SEC 56-SDMS-07, Clause 1, PDF page 3; clause 4.2.1.1, PDF page 42026-11-11
U-03Neutral arrangementMedium voltageLow voltageMV neutral solidly grounded or low resistance grounded. LV neutral solidly grounded.Clause 4.1, Table 1SEC 56-SDMS-07, Clause 4.1, Table 1, PDF page 42026-11-11
U-04Maximum overall size at 13.8 kVMedium voltageLow voltage500 kVA: 1800 x 1500 x 2200 mm. 1000 kVA: 2200 x 1500 x 2200 mm. 1500 kVA: 2400 x 1800 x 2200 mm (length x width x height, with enclosure).mmClause 4.3.1, Table 2SEC 56-SDMS-07, Clause 4.3.1, Table 2, PDF page 72026-11-11
U-05Maximum overall size at 36 kVMedium voltageLow voltage500 kVA: 2000 x 1500 x 2200 mm. 1000 kVA: 2300 x 1700 x 2200 mm. 1500 kVA: 2400 x 1900 x 2200 mm.mmClause 4.3.2, Table 3SEC 56-SDMS-07, Clause 4.3.2, Table 3, PDF page 72026-11-11
U-06Main circuit breaker ratings in the LV panelLow voltageMain circuit breaker 800 A, 1600 A or 2500 A. Number of distribution units 6, 12 or 14.The schedule does not say which breaker rating goes with which kVA rating. The specification refers to 31-SDMS-07 for other details such as the number of outgoing circuits and bus-bar sizes.800, 1600, 2500AClause 7, Data Schedule 1, items 4 and 5SEC 56-SDMS-07, Clause 7, Data Schedule 1, items 4 and 5, PDF page 112026-11-11
U-07Enclosure degree of protectionMedium voltageLow voltageIP54 for the LV compartment (type tested to IEC 60529) and for the MV termination box.54IPClauses 4.2.2.7 and 5.1SEC 56-SDMS-07, Clause 4.2.2.7, PDF page 6; clause 5.1, PDF page 92026-11-11
U-08Enclosure sheet thickness and finishMedium voltageLow voltageMV termination box and LV compartment in galvanized sheet steel at least 3 mm thick, or Alum-zinc at least 2 mm. Finish colour RAL 7035.3, 2mmClauses 4.2.1.2 and 4.6.2SEC 56-SDMS-07, Clause 4.2.1.2, PDF page 4; clause 4.6.2, PDF page 82026-11-11
U-09Internal arc test of the transformer cable boxMedium voltage16 kA for 0.3 seconds.16kA for 0.3 sClause 7, Data Schedule 2, item 4.7SEC 56-SDMS-07, Clause 7, Data Schedule 2, item 4.7, PDF page 122026-11-11
U-10Provision for mobile generator cablesLow voltageOne 250 x 250 mm gasketed opening on the LV door. 13 mm holes on the bus-bars: 2 per phase and 1 on neutral for 500 kVA, 4 per phase and 2 on neutral for 1000 and 1500 kVA.13mmClause 4.5 and Data Schedule 2SEC 56-SDMS-07, Clause 4.5 and Data Schedule 2, PDF page 82026-11-11
U-11SDMS 51-SDMS-03Medium voltageDistribution transformer up to 36 kV, 400/230 V, with aluminium windings.Clause 3.1SEC 56-SDMS-07, Clause 3.1, PDF page 32026-11-11
U-12SDMS 31-SDMS-07 and 31-SDMS-08Low voltage31-SDMS-07: dual LV distribution panel with aluminium bus-bar, main circuit breaker and outgoing MCCBs. The LV compartment must comply with 31-SDMS-08, which also covers name plates and circuit labels (clauses 4.7 and 4.8). In a conflict with 31-SDMS-07, "this specification" applies; the clause does not say whether that means 56-SDMS-07 or 31-SDMS-08.The sentence says "this specification" without saying which one; both readings are possible.Clauses 3.2, 4.2.3.1SEC 56-SDMS-07, Clause 3.2, PDF page 3; clause 4.2.3.1, PDF page 6; clauses 4.7 and 4.8, PDF page 82026-11-11
U-13SDMS 37-SDMS-02 and 37-SDMS-04Low voltage37-SDMS-02: LV molded case circuit breakers for LV distribution panels, 400 A. 37-SDMS-04: interface low voltage main circuit breakers.Clauses 3.3 and 3.4SEC 56-SDMS-07, Clauses 3.3 and 3.4, PDF page 32026-11-11
U-14SDMS 11-SDMS-03, 12-SDMS-01, 12-SDMS-02Medium voltage11-SDMS-03: XLPE insulated power cables from 15 kV up to 36 kV. 12-SDMS-01: cable joints, terminations and accessories up to 36 kV. 12-SDMS-02: lugs and connectors for MV and LV distribution systems.Clauses 3.5, 3.8, 3.9SEC 56-SDMS-07, Clauses 3.5 and 3.8, PDF page 3; clause 3.9, PDF page 42026-11-11
U-15SDMS 50-SDMS-01, 38-SDMS-03, 40-SDMS-02AMedium voltageLow voltage50-SDMS-01: current transformers up to 36 kV. 38-SDMS-03: LV digital panel meters. 40-SDMS-02A: electronic revenue CT and CT-VT meter.Clauses 3.10, 3.12, 3.13SEC 56-SDMS-07, Clauses 3.10, 3.12, 3.13, PDF page 42026-11-11

Site service conditions (5)

Temperature, altitude, humidity, wind, soil and enclosure protection assumed for equipment in the Kingdom.

Saudi Electricity Supply and Connection Requirements Dataset: Site service conditions
IDRequirementValueNumberUnitClauseSourceVerified
N-01Outdoor ambient temperature for equipmentLow voltageMedium voltageMinimum -5 degrees C, maximum 55 degrees C, hottest-month average 40 degrees C, yearly average 30 degrees C.55°C maxAnnex DSEC solar standard, Annex D, PDF page 422026-11-11
N-02Indoor ambient temperatureLow voltageMedium voltage25 degrees C in air-conditioned buildings. 40 degrees C in buildings with no air conditioning.25, 40°CAnnex DSEC solar standard, Annex D, PDF page 422026-11-11
N-03Soil thermal resistivity for cable sizingLow voltageMedium voltage2.0 degrees C metre per watt at one metre depth and below.2.0°C.m/WAnnex DSEC solar standard, Annex D, PDF page 422026-11-11
N-04Altitude, humidity and windLow voltageMedium voltageAltitude up to 1000 m is normal. Maximum relative humidity 100%. Maximum wind velocity 150 km/h. Average annual rainfall 150 mm.1000, 100, 150m, %, km/hAnnex DSEC solar standard, Annex D, PDF page 422026-11-11
N-05Minimum enclosure protection degreeLow voltageMedium voltageOutdoor equipment IP54 at least, weatherproof and corrosion resistant. Indoor equipment IP41.54, 41IPAnnex D, note 2SEC solar standard, Annex D, note 2, PDF page 432026-11-11

Sources

  • The Saudi Arabian Grid CodePublisher: Saudi Electricity Regulatory Authority (SERA). Version: Updated version: May 2024Checked copyOfficial addressChecked copy: Internet Archive capture of 28 November 2025. sera.gov.sa did not answer from our network on 2026-11-11. Arabic wording of rows is our translation of the English text. No official Arabic title of this English document was found, so the Arabic name is a plain descriptive one (the service guide calls the transmission code الكود السعودي لنقل الكهرباء).
  • Electricity Service Provision Guide (Arabic edition)Publisher: Saudi Electricity Regulatory Authority (SERA). Version: 8th edition, Jumada al-Awwal 1444 HChecked copyOfficial addressChecked copy: Internet Archive capture of 11 September 2025. The Arabic text was read; the English wording of rows is ours.
  • Regulatory Framework for Small-Scale Solar PV Systems, ERD-TA-012 (V02/19), Arabic editionPublisher: Saudi Electricity Regulatory Authority (SERA). Version: Version 2, Muharram 1442 HChecked copyOfficial addressChecked copy: Internet Archive capture of 2 May 2025. The Arabic text was read; the English wording of rows is ours.
  • Regulatory Framework for Renewable Energy Generation for Self-Consumption, ERD-TA-004 (V02/23)Publisher: Saudi Electricity Regulatory Authority (SERA). Version: Version 2, June 2023Checked copyOfficial addressChecked copy: Internet Archive capture of 4 April 2025. The English text is a translation by SERA of the Arabic original, which prevails. Arabic wording of rows is our translation of the English.
  • Technical Standards for the Connection of Small-Scale Solar PV Systems to the LV and MV Distribution Networks of SECPublisher: Saudi Electricity Company (SEC). Version: Version 3.2, 3 March 2020Checked copyOfficial addressRead directly on SEC's own host on 2026-11-11, which opens from outside Saudi Arabia. The file name says v312 and the cover says Version 3.2. Arabic wording of rows is our translation; SEC publishes the document in English.
  • SEC Distribution Materials Specification 56-SDMS-07 Rev.02: Unit Substations up to 36 kV, Aluminum Transformer, Aluminum Bus Bars LVDP with Main Circuit Breaker and Outgoing MCCBsPublisher: Saudi Electricity Company (SEC). Version: Rev.02, issue date 03/2023Checked copyOfficial addressRead directly on SEC's own host on 2026-11-11, which opens from outside Saudi Arabia. Page numbers in the PDF run to 15 although its footer says "of 17". Arabic wording of rows is our translation.

Method and limits

Sources. The Saudi Arabian Grid Code (updated May 2024), the SERA Electricity Service Provision Guide (8th edition, in Arabic), the SERA Regulatory Framework for Small-Scale Solar PV Systems (Arabic edition, version 2), the SERA Regulatory Framework for Renewable Energy Generation for Self-Consumption (version 2, June 2023), and two SEC documents: the small-scale solar connection standard (version 3.2) and material specification 56-SDMS-07 (Rev.02, March 2023). Nothing here comes from a private or paid source.

How each row was checked. Rows were extracted from the source with a verbatim quote, the page and the clause. For English sources the quote was matched automatically against the text of the PDF. Tables, and every row from the Arabic guide and the Arabic solar framework, were read from rendered page images. The date in the Verified column is the date the source was read for that row.

Arabic. Rows from the two Arabic originals use the wording of the official Arabic text, and the English is ours. Rows from English documents carry our Arabic translation, written for a Saudi engineer and using the terms of the official Arabic documents. For the self-consumption framework the English is a translation by the regulator and the Arabic text prevails.

Links. sera.gov.sa did not answer from our network on 2026-11-11, so SERA rows link to Internet Archive captures of the official files. The capture date is in each link, and the Sources list gives the official address. SEC's own host, se.com.sa, opened, so rows from the SEC solar standard and 56-SDMS-07 link to SEC directly.Page numbers are PDF page numbers, not printed ones.

What is left out. Consumption tariffs, connection charges, service fees and the reactive power tariff are left out of this dataset, as are all amounts of money. SERA publishes them in the annexes of its service guide (consumption tariff, connection charge and service fees) and on sera.gov.sa. The Saudi Arabian Distribution Code is not covered: we could not open an official copy for this version, and the numeric power factor limit of clause DPC2.4 and the harmonic planning levels of clause DPC2.3 are in it. The solar and EV standards point to those clauses and rows Q-07 and Q-08 say so. EV charging rules are left out of version 1.0: the SEC charging standard and the regulator's charging framework could only be found on a third-party host, and no official-host copy could be opened. The guide also carries load tables for 220 V supplies, which this version does not list. The SEC specifications listed are the ones cited by 56-SDMS-07, not the full SDMS list.

Limits. This is a reference. It is not legal advice and it is not a SERA or SEC publication. SERA and SEC can amend a code, framework or specification at any time, and the SEC standards say a later edition supersedes them. Read the current official text before you design, file or build.

Corrections. If you find an error, write to info@nlspower.com with the row ID. Corrections are dated and the version number goes up.

Frequently Asked Questions

What are the low-voltage supply levels in Saudi Arabia?+

SEC's solar standard lists 400/230 V, 380/220 V and 220/127 V as low-voltage levels (clause 4, row V-01) and three configurations, led by three-phase four-wire 400/230 V (Annex C, row V-05). The Grid Code gives the nominal frequency as 60 Hz for the transmission system (clause 2.4.2.1, row V-04). A 220/127 V supply upgraded to 400/230 V leaves 127 V single-phase inverters unusable (clause 6.9.7.5, row V-06).

How much can voltage and frequency vary on a Saudi supply?+

SEC's solar standard, quoting the Distribution Code, gives plus or minus 5% under normal operating conditions, which is 380 to 420 V at 400/230 V (Table 3, row F-06). On the transmission grid the Grid Code keeps frequency between 59.9 and 60.1 Hz (clause 2.4.2.1, row F-01). Solar systems must stay connected from 90 to 110% of nominal voltage (clause 6.5, row F-10).

What power factor does the Grid Code set for large customers?+

Clause 2.5.6.4 (row Q-05) says distribution entities and directly connected customers with contracted load above 1.0 MVA should take all precautionary measures to maintain 85% lagging. Their minimum allowable power factor will be 90% lagging after five years and 95% lagging after ten years from 21-10-1433. The numeric limit for other sites on the distribution network is in clause DPC2.4 of the Distribution Code, which this dataset does not cover (row Q-07). Tariff amounts are left out.

At what load is supply at medium voltage, and when must I provide a substation room?+

The SERA service guide supplies loads up to 4 MVA at low voltage and loads above 4 MVA up to 25 MVA at medium voltage (Article 11, rows C-02 and C-03). The customer provides a substation site inside the plot when the load for the built area exceeds 166 kVA, with no more than 20 m2 per transformer (clause 11-1-7, rows C-06 and C-07).

What are the limits for small-scale solar PV on a Saudi site?+

One premises may host 1 kW up to 2 MW (clause 5-1 c, row S-10), and a consumer may not exceed 5 MW combined in one electricity department area (row S-11). Capacity may not exceed contracted load (row S-12). Above 100 kW a second meter is needed (row S-13). Above 11 kW SEC requires ride-through and remote disconnection, and above 20 kW a backup switch (rows S-05 and S-06).

What ratings and sizes does an SEC unit (package) substation come in?+

SEC specification 56-SDMS-07 covers 500, 1000 and 1500 kVA units at 13.8 kV or 36 kV with a 400/231 V secondary (clause 7, row U-01). A 13.8 kV unit of 1000 kVA is at most 2200 x 1500 x 2200 mm (Table 2, row U-04). The LV compartment is IP54 (row U-07), and the unit does not include MV switchgear (row U-02).