Saudi Electricity Supply and Connection Requirements Dataset
SEC lists three low-voltage levels in Saudi Arabia: 400/230 V, 380/220 V and 220/127 V. The Grid Code gives 60 Hz for the transmission system. SEC's solar standard, quoting the Distribution Code, gives voltage ranges of plus or minus 5% in normal operation. The SERA guide supplies loads up to 4 MVA of simultaneous demand at low voltage. Each of the 108 rows cites its clause.
- Rows
- 108
- Version
- 1.0
- Last verified
- 2026-11-11
- Licence
- CC BY 4.0
This is a working reference for engineers, consultants and contractors who size or specify electrical equipment for a site in Saudi Arabia. Each row is one requirement or one fact. Each row names the clause or table it comes from, links to the published document it was checked against, and carries the date of that check.
The 108 rows fall in 9 groups: supply voltages and frequency, permitted variation, power factor and power quality, connection rules and supply service, breaker and load tables at 400/230 V, line clearances, small-scale solar and renewable self-consumption, the Saudi Electricity Company (SEC) unit substation specification with the SDMS numbers it cites, and site service conditions.
The values come from the Saudi Arabian Grid Code, the SERA electricity service guide, two SERA frameworks for solar, and a technical standard and a material specification published by SEC. The Saudi Arabian Distribution Code is not in this version. The method note says why.
How to cite
NLS Power (2026). Saudi Electricity Supply and Connection Requirements Dataset, version 1.0. https://nlspower.com/en/data/saudi-electricity-supply-requirements. Licensed under CC BY 4.0.
Page URL: https://nlspower.com/en/data/saudi-electricity-supply-requirements
Supply voltages and frequency (8)
Nominal low, medium and transmission voltages, supply configurations and the 60 Hz system frequency.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| V-01 | Low voltage nominal levels in KSA (solar standard)Low voltage | 400/230 V, 380/220 V and 220/127 V. Low voltage means a nominal voltage below 1 kV AC (or 1.5 kV DC). | 400/230 | V | Clause 4, Distribution System / Network | SEC solar standard, Clause 4, Distribution System / Network, PDF page 8 | 2026-11-11 |
| V-02 | Medium voltage nominal levels (solar standard)Medium voltage | 13.8 kV and 33 kV. Medium voltage covers nominal voltages from 1 kV AC up to 36 kV. | 13.8, 33 | kV | Clause 4, Distribution System / Network | SEC solar standard, Clause 4, Distribution System / Network, PDF page 8 | 2026-11-11 |
| V-03 | Transmission system nominal voltagesTransmission | 110 kV, 115 kV, 132 kV, 230 kV and 380 kV. | 110, 115, 132, 230, 380 | kV | Clause 2.4.3 | Grid Code, Clause 2.4.3, PDF page 32 | 2026-11-11 |
| V-04 | Nominal frequency and phase rotationLow voltageMedium voltageTransmission | 60 Hz, with R-Y-B counter-clockwise phase rotation, on the transmission system. | 60 | Hz | Clause 2.4.2.1 | Grid Code, Clause 2.4.2.1, PDF page 31 | 2026-11-11 |
| V-05 | LV supply configurations in the SEC networkLow voltage | Three-phase four-wire 400/230 V; three-phase four-wire 220/127 V; three-phase three-wire 220 V.The standard says these have to be considered when choosing inverters and equipment for a site on the LV network. | Annex C | SEC solar standard, Annex C, PDF pages 40 and 41 | 2026-11-11 | ||
| V-06 | Upgrade of a 220/127 V supply to 400/230 VLow voltage | A 127 V single-phase inverter can no longer be used after the upgrade. A 230 V inverter can be moved to a phase-to-neutral connection and reconfigured. The consumer bears the cost of modification or replacement. | Clause 6.9.7.5, Disclaimer | SEC solar standard, Clause 6.9.7.5, Disclaimer, PDF page 28 | 2026-11-11 | ||
| V-07 | Unit substation LV rating (SEC specification)Low voltage | 400/231 V on the secondary side, for unit substations of 500, 1000 and 1500 kVA.The specification writes 400/231 V here and in its dimension tables, while the same utility writes 400/230 V elsewhere. | 400/231 | V | Clause 7, Data Schedule, item 3 | SEC 56-SDMS-07, Clause 7, Data Schedule, item 3, PDF page 11 | 2026-11-11 |
| V-08 | Definition of standard voltageLow voltageMedium voltage | The voltage set for transmitting and distributing electric power, as approved in the transmission and distribution codes. | Article 1, definitions | Service guide, Article 1, definitions, PDF page 8 | 2026-11-11 |
Permitted variation and operating ranges (12)
Voltage and frequency bands in normal and exceptional operation, and the windows small solar systems must ride through.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| F-01 | Normal frequency band, transmission gridTransmission | The transmission operator maintains frequency between 59.9 and 60.1 Hz in normal operation. | 59.9 to 60.1 | Hz | Clause 2.4.2.1 | Grid Code, Clause 2.4.2.1, PDF page 31 | 2026-11-11 |
| F-02 | Exceptional frequency limitsTransmission | System frequency could rise to 62.5 Hz or fall to 57.0 Hz in exceptional circumstances. | 57.0 to 62.5 | Hz | Clause 2.4.2.2 | Grid Code, Clause 2.4.2.2, PDF page 31 | 2026-11-11 |
| F-03 | Generator operation time by frequency bandTransmission | Continuous: 58.8 to 60.5 Hz. For 30 minutes: 57.5 to 58.7 Hz and 60.6 to 61.5 Hz. For 30 seconds: 57.0 to 57.4 Hz and 61.6 to 62.5 Hz.The Grid Code table is written for generator plant. The SEC solar standard (Table 1) repeats the same bands for small solar systems. | 58.8 to 60.5 | Hz | Clause 2.4.2.2, table | Grid Code, Clause 2.4.2.2, table, PDF page 31 | 2026-11-11 |
| F-04 | Normal voltage range, 110 kV to 380 kVTransmission | Within plus or minus 5% of nominal voltage under normal conditions, at any point of the transmission system. | 5 | % | Clause 2.4.3 | Grid Code, Clause 2.4.3, PDF page 32 | 2026-11-11 |
| F-05 | Exceptional voltage range, 110 kV to 380 kVTransmission | Plus or minus 10% of nominal voltage. The maximum over-voltage should not be exceeded for more than 30 minutes. | 10 | % | Clause 2.4.3 | Grid Code, Clause 2.4.3, PDF page 32 | 2026-11-11 |
| F-06 | Voltage range at 400/230 V in normal operationLow voltage | Lowest 380/218.5 V, highest 420/241.5 V (plus or minus 5%).The standard says the intervals are those specified in the Distribution Code. | 380 to 420 | V | Table 3 (solar standard), clause 6.9.7.1 | SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 27 | 2026-11-11 |
| F-07 | Voltage range at 380/220 V in normal operationLow voltage | Lowest 360/209 V, highest 400/231 V.Calculated by us, not printed: 5% of 380 V is 19 V, which gives 361 V and 399 V, so the printed values are rounded. | 360 to 400 | V | Table 3 (solar standard), clause 6.9.7.1 | SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 27 | 2026-11-11 |
| F-08 | Voltage range at 220/127 V in normal operationLow voltage | Lowest 209/120 V, highest 231/134 V. | 209 to 231 | V | Table 3 (solar standard), clause 6.9.7.1 | SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 27 | 2026-11-11 |
| F-09 | Voltage range at 13.8 kV and 33 kV in normal operationMedium voltage | 13.8 kV: lowest 13.1 kV, highest 14.5 kV. 33 kV: lowest 31.4 kV, highest 34.7 kV. | Table 3 (solar standard), clause 6.9.7.1 | SEC solar standard, Table 3 (solar standard), clause 6.9.7.1, PDF page 27 | 2026-11-11 | ||
| F-10 | Operating range a small solar system must ride throughLow voltageMedium voltage | Voltage 90 to 110% of nominal at the connection point, continuous. The frequency bands of row F-03 also apply. | 90 to 110 | % | Clause 6.5, Table 2 | SEC solar standard, Clause 6.5, Table 2, PDF page 16 | 2026-11-11 |
| F-11 | Window for connecting or reconnecting a solar systemLow voltageMedium voltage | Frequency 59.5 to 60.05 Hz and voltage 95 to 105% of nominal, held for at least 300 seconds. | 300 | s | Clause 6.9.1 and 6.9.3 | SEC solar standard, Clause 6.9.1 and 6.9.3, PDF page 23 | 2026-11-11 |
| F-12 | Voltage step when a solar system connects or disconnectsLow voltageMedium voltage | Synchronizing must not cause a transient voltage change above 4% of nominal. Connecting or disconnecting must not cause voltage variations above 3% of the rated voltage. | 3 to 4 | % | Clauses 6.9.1 and 6.9.7.2 | SEC solar standard, Clauses 6.9.1 (PDF page 23) and 6.9.7.2 (PDF page 27) | 2026-11-11 |
Power factor and power quality (10)
Power factor thresholds, harmonics, unbalance, flicker and related limits. Thresholds only, no tariff amounts.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| Q-01 | Voltage harmonics limit at the transmission connection pointTransmission | Total harmonic distortion of 1.5%, with no individual harmonic above 1%, when the connection agreement sets no limit.The clause applies to plant and apparatus connected to the transmission system. Distribution-level limits are in the Distribution Code, which is not covered by this dataset. | 1.5 | % THD | Clause 2.4.4.2 | Grid Code, Clause 2.4.4.2, PDF page 32 | 2026-11-11 |
| Q-02 | Voltage unbalance caused by a userTransmission | A user facility must not cause phase-to-phase unbalance to exceed 1% at the connection point. | 1 | % | Clause 2.4.5 | Grid Code, Clause 2.4.5, PDF page 33 | 2026-11-11 |
| Q-03 | Voltage fluctuation from a fluctuating demandTransmission | Repeated step changes must not exceed 1% of nominal voltage. Other large excursions may be allowed up to 3% if they pose no risk. | 1 to 3 | % | Clause 2.4.6.1 | Grid Code, Clause 2.4.6.1, PDF page 33 | 2026-11-11 |
| Q-04 | Flicker severity limitsTransmission | Pst not above 0.8 and Plt not above 0.6, both 95th percentile values measured over one week. | 0.8, 0.6 | Pst, Plt | Clause 2.4.6.2 | Grid Code, Clause 2.4.6.2, PDF page 33 | 2026-11-11 |
| Q-05 | Power factor of distribution entities and directly connected customers with contracted load above 1 MVALow voltageMedium voltageTransmission | Distribution entities and directly connected customers with contracted load above 1.0 MVA should take all precautionary measures to maintain 85% lagging power factor. Their minimum allowable power factor will be 90% lagging after five years from 21-10-1433, and 95% lagging after ten years from the said date.The clause gives the date without a calendar label; we read it as Hijri. Derived by us, not printed: adding five and ten years gives 21-10-1438 H and 21-10-1443 H. The clause names distribution entities and directly connected customers. Where the numeric power factor limit for other sites on the distribution network sits is in clause DPC2.4 of the Distribution Code, which this dataset does not cover (row Q-07). The clause also says a tariff applies to excess reactive power under SERA Board Resolution 2/27/23. The tariff amount is left out of this dataset. | 0.85, 0.90, 0.95 | lagging | Clause 2.5.6.4 | Grid Code, Clause 2.5.6.4, PDF page 50 | 2026-11-11 |
| Q-06 | Power factor range of synchronous generatorsTransmission | Rated active power at any point between 85% lagging and 95% capacitive at the generating unit terminals, unless the grid operator agrees otherwise. | 0.85 lag to 0.95 lead | power factor | Clause 2.5.5.1 | Grid Code, Clause 2.5.5.1, PDF page 38 | 2026-11-11 |
| Q-07 | Power factor limit for a site with a solar systemLow voltageMedium voltage | Must meet the power factor limits of the Distribution Code (clause DPC2.4), measured at the connection point.This dataset gives no numeric limit from DPC2.4: the official text of the Distribution Code could not be opened for the checking of this version. | Clause 6.9.6 | SEC solar standard, Clause 6.9.6, PDF page 26 | 2026-11-11 | ||
| Q-08 | Harmonic limits for MV-connected solar systemsMedium voltage | Harmonic and interharmonic voltages must not exceed the planning levels in the Distribution Code, clause DPC2.3. | Clause 6.9.7.3 | SEC solar standard, Clause 6.9.7.3, PDF page 27 | 2026-11-11 | ||
| Q-09 | DC injection limitLow voltageMedium voltage | Solar systems must not inject DC current. The requirement is met if the injected DC component is below 0.5% of rated AC current. | 0.5 | % of rated AC current | Clause 6.9.7.4 | SEC solar standard, Clause 6.9.7.4, PDF page 27 | 2026-11-11 |
| Q-10 | Current imbalance from single-phase solar invertersLow voltage | Up to 11 kW, single or two-phase inverters may be used if spread equally across phases, with the imbalance between two phases below 16 A (3.52 kW at 220 V). Above that, use three-phase inverters, or single or two-phase inverters joined by a communication link that restores the power balance between the phases. | 16 | A | Clause 6.9.7.5 | SEC solar standard, Clause 6.9.7.5, PDF page 27 | 2026-11-11 |
Connection rules and supply service (18)
Which voltage a load is supplied at, when a substation room is needed, time limits, documents, meter locations and temporary supply.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| C-01 | Supply voltage class by simultaneous demand loadLow voltageMedium voltage | Supply rules depend on the simultaneous demand load: up to 4 MVA; above 4 MVA and up to 25 MVA; above 25 MVA.Source: the Arabic text of the guide (8th edition). The English wording is ours. | 4, 25 | MVA | Article 11 | Service guide, Article 11, PDF page 19 | 2026-11-11 |
| C-02 | Loads supplied at low voltageLow voltage | Loads whose simultaneous demand does not exceed 4 MVA are supplied at low distribution voltage. | 4 | MVA | Article 11, clause 11-1-1 | Service guide, Article 11, clause 11-1-1, PDF page 19 | 2026-11-11 |
| C-03 | Loads supplied at medium voltageMedium voltage | Loads above 4 MVA and up to 25 MVA are supplied at medium distribution voltage. | 4 to 25 | MVA | Article 11, clause 11-2-1 | Service guide, Article 11, clause 11-2-1, PDF page 21 | 2026-11-11 |
| C-04 | Loads supplied at transmission voltageTransmission | Loads above 25 MVA and up to 120 MVA are supplied at high transmission voltage. Loads above 120 MVA are supplied at high or extra-high transmission voltage. | 25, 120 | MVA | Article 11, clauses 11-3-1 and 11-3-2 | Service guide, Article 11, clauses 11-3-1 and 11-3-2, PDF page 22 | 2026-11-11 |
| C-05 | Exception: MV supply for loads above 25 MVAMedium voltage | The provider may supply such a load at medium voltage from one of its substations if it does not reduce supply reliability or delay supply to consumers with loads below 25 MVA in the same area. The customer shares the substation cost in proportion to its demand against the safe capacity. | 25 | MVA | Article 11, clause 11-3-3 | Service guide, Article 11, clause 11-3-3, PDF page 22 | 2026-11-11 |
| C-06 | When the customer must provide a substation roomLow voltage | When the load for the whole built area of the premises (per the building permit) exceeds 166 kVA, whatever the breaker loads installed by the provider. The customer provides the site inside the plot for the transformers and equipment.Derived from the table, not printed in this clause: 166 kVA is the last printed row for a 200 A breaker in the residential table (1500 m2), see row L-09. | 166 | kVA | Article 11, clause 11-1-7 | Service guide, Article 11, clause 11-1-7, PDF page 20 | 2026-11-11 |
| C-07 | Conditions for the substation siteLow voltage | On an approved street. Area not more than 20 m2 per transformer. Matching the provider's approved drawings and specifications. Municipal approval of the site. | 20 | m2 per transformer | Article 11, clause 11-1-7 (a to d) | Service guide, Article 11, clause 11-1-7 (a to d), PDF page 20 | 2026-11-11 |
| C-08 | Customer substation at medium voltageMedium voltage | The customer builds its own transformation substation and is responsible for operating and maintaining it, in addition to building, operating and maintaining its own private network. | Article 11, clause 11-2-5 | Service guide, Article 11, clause 11-2-5, PDF page 21 | 2026-11-11 | ||
| C-09 | Provider operating a customer substationMedium voltage | Exception: the provider operates and maintains it if the substation meets the provider's standard specifications, sits on the outer boundary of the plot with free access for the provider, and its equipment ownership passes to the provider. A customer who wants to keep ownership pays the provider a yearly charge set in the guide.The yearly charge is left out of this dataset because it is a payment term. | Article 11, clause 11-2-6 | Service guide, Article 11, clause 11-2-6, PDF page 21 | 2026-11-11 | ||
| C-10 | Time to connect after paying the connection chargeLow voltage | The provider connects a low voltage supply within 20 working days of the payment date, if there are no obstacles outside its control. | 20 | working days | Article 10, clause 10-2 | Service guide, Article 10, clause 10-2, PDF page 19 | 2026-11-11 |
| C-11 | Time to pay the connection chargeLow voltageMedium voltage | The applicant pays within 90 days of being notified. After that the provider may reassess the study and recalculate costs.The charge itself is set in Annex 3 of the guide and is not part of this dataset. | 90 | days | Article 10, clause 10-4 | Service guide, Article 10, clause 10-4, PDF page 19 | 2026-11-11 |
| C-12 | Small loads supplied without a meterLow voltage | Small fixed loads (units) of not more than 4 kVA are supplied from the nearest supply source. If technical obstacles stop a meter being fitted, they can be connected without one and consumption is then calculated under clause 36-3-3. | 4 | kVA | Article 12, clause 12-1 | Service guide, Article 12, clause 12-1, PDF page 23 | 2026-11-11 |
| C-13 | Protection required for small loadsLow voltage | A breaker against overload, short circuit and earth leakage, with a breaker earth leakage sensitivity of not less than 30 mA (as printed). At least one earth rod. A timer that cuts the circuit at each feed point so that units which need power only at night are limited to it.The printed wording is that the breaker sensitivity to earth leakage current must not be less than 30 mA. Check with the provider how it applies this to the device selected. | not less than 30 | mA | Annex 6, Table 1 (small loads), items 5 to 7 | Service guide, Annex 6, Table 1 (small loads), items 5 to 7, PDF page 76 | 2026-11-11 |
| C-14 | First documents for a new connection (items 1 to 4 of 11)Low voltageMedium voltage | Signed connection agreement, coordination certificate from the provider, and a copy of the building permit. For mosques, approval of the Ministry of Islamic Affairs on payment of consumption bills. | Annex 6, Table 1 (new connection), items 1 to 4 | Service guide, Annex 6, Table 1 (new connection), items 1 to 4, PDF page 76 | 2026-11-11 | ||
| C-15 | Meter location for 1 to 8 metersLow voltage | Meters go on the front fence from outside. | 1 to 8 | electricity meters | Annex 6, Table 5 | Service guide, Annex 6, Table 5, PDF page 77 | 2026-11-11 |
| C-16 | Meter location for 9 to 20 metersLow voltage | At a location agreed with the provider on the side fence wall, provided the building has no front fence. If the customer cannot offer a side wall, a meter room is required. | 9 to 20 | electricity meters | Annex 6, Table 5 | Service guide, Annex 6, Table 5, PDF page 77 | 2026-11-11 |
| C-17 | Meter room above 20 metersLow voltage | The customer must provide a meter room built to the provider's specifications. | 20 | electricity meters | Annex 6, Table 5 | Service guide, Annex 6, Table 5, PDF page 77 | 2026-11-11 |
| C-18 | Temporary supply for constructionLow voltage | Temporary meter of 30 A, increasable to no more than 10% of the total permanent load once the need is justified. A valid building permit or a lawful licence is required. Connection within 20 working days of payment for low voltage. | 30 | A | Article 13, clause 13-1-1; Annex 6, Table 2 | Service guide, Article 13, clause 13-1-1 (PDF page 23); Annex 6, Table 2 (PDF page 76) | 2026-11-11 |
Breaker size and load tables at 400/230 V (15)
The guide's indicative table linking breaker size, connected load and built area for residential and commercial buildings.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| L-01 | Suggested breaker 20 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 20 A breaker. Residential: from 3 kVA at 25 m2 (first row) to 16 kVA at 125 m2 (last row). Commercial: from 5 kVA at 25 m2 to 13 kVA at 75 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 20 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-02 | Suggested breaker 30 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 30 A breaker. Residential: from 17 kVA at 126 m2 (first row) to 22 kVA at 175 m2 (last row). Commercial: from 14 kVA at 76 m2 to 22 kVA at 125 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 30 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-03 | Suggested breaker 40 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 40 A breaker. Residential: from 23 kVA at 176 m2 (first row) to 32 kVA at 250 m2 (last row). Commercial: from 23 kVA at 126 m2 to 30 kVA at 175 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 40 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-04 | Suggested breaker 50 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 50 A breaker. Residential: from 33 kVA at 251 m2 (first row) to 40 kVA at 325 m2 (last row). Commercial: from 31 kVA at 176 m2 to 38 kVA at 225 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 50 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-05 | Suggested breaker 70 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 70 A breaker. Residential: from 41 kVA at 326 m2 (first row) to 56 kVA at 475 m2 (last row). Commercial: from 39 kVA at 226 m2 to 56 kVA at 325 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 70 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-06 | Suggested breaker 100 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 100 A breaker. Residential: from 57 kVA at 476 m2 (first row) to 82 kVA at 725 m2 (last row). Commercial: from 57 kVA at 326 m2 to 82 kVA at 475 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 100 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-07 | Suggested breaker 125 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 125 A breaker. Residential: from 83 kVA at 726 m2 (first row) to 101 kVA at 900 m2 (last row). Commercial: from 83 kVA at 476 m2 to 102 kVA at 600 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 125 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-08 | Suggested breaker 150 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 150 A breaker. Residential: from 102 kVA at 901 m2 (first row) to 125 kVA at 1125 m2 (last row). Commercial: from 103 kVA at 601 m2 to 124 kVA at 725 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 150 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-09 | Suggested breaker 200 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 200 A breaker. Residential: from 126 kVA at 1126 m2 (first row) to 166 kVA at 1500 m2 (last row). Commercial: from 125 kVA at 726 m2 to 166 kVA at 1000 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 200 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-10 | Suggested breaker 250 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 250 A breaker. Residential: from 167 kVA at 1501 m2 (first row) to 208 kVA at 1900 m2 (last row). Commercial: from 167 kVA at 1001 m2 to 192 kVA at 1125 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 250 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-11 | Suggested breaker 300 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 300 A breaker. Residential: from 209 kVA at 1901 m2 (first row) to 250 kVA at 2300 m2 (last row). Commercial: from 193 kVA at 1126 m2 to 239 kVA at 1400 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 300 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 69 (residential) and 71 (commercial) | 2026-11-11 |
| L-12 | Suggested breaker 400 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 400 A breaker. Residential: from 251 kVA at 2301 m2 (first row) to 325 kVA at 3000 m2 (last row). Commercial: from 240 kVA at 1401 m2 to 316 kVA at 1850 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 400 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 71 (commercial) | 2026-11-11 |
| L-13 | Suggested breaker 500 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 500 A breaker. Residential: from 326 kVA at 3001 m2 (first row) to 389 kVA at 3600 m2 (last row). Commercial: from 317 kVA at 1851 m2 to 393 kVA at 2300 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 500 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 71 (commercial) | 2026-11-11 |
| L-14 | Suggested breaker 600 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 600 A breaker. Residential: from 390 kVA at 3601 m2 (first row) to 475 kVA at 4400 m2 (last row). Commercial: from 394 kVA at 2301 m2 to 461 kVA at 2700 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 600 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 71 (commercial) | 2026-11-11 |
| L-15 | Suggested breaker 800 A at 400/230 V: connected load and built areaLow voltage | Table rows for a 800 A breaker. Residential: from 476 kVA at 4401 m2 (first row) to 648 kVA at 6000 m2 (last row). Commercial: from 462 kVA at 2701 m2 to 640 kVA at 3800 m2.The ranges are the first and last printed rows of the table for that breaker size (one printed row per area step). The residential table is on the first page cited and the commercial table on the next-but-one page of the PDF. These are indicative tables for calculating loads and are not a design rule. | 800 | A | Annex 4, guideline tables for 400/230 V | Service guide, Annex 4, tables for 400/230 V, PDF page 70 (residential) and 72 (commercial) | 2026-11-11 |
Line clearances and corridors (7)
Vertical and horizontal clearances for distribution lines and the corridor width of transmission lines.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| K-01 | Vertical clearance for 69 kV linesLow voltageMedium voltage | Lowest sag point of the line to the highest point of: building (or structure) 5 m, telephone line 3 m, railway 15 m, fast road 12 m, public road 12 m, agricultural road 12 m. | m | Annex 11, Table 2 | Service guide, Annex 11, Table 2, PDF page 89 | 2026-11-11 | |
| K-02 | Vertical clearance for 34.5/33 kV linesLow voltageMedium voltage | Lowest sag point of the line to the highest point of: building (or structure) 4 m, telephone line 2 m, railway 8.5 m, fast road 12 m, public road 7 m, agricultural road 6.7 m. | m | Annex 11, Table 2 | Service guide, Annex 11, Table 2, PDF page 89 | 2026-11-11 | |
| K-03 | Vertical clearance for 13.8 kV linesLow voltageMedium voltage | Lowest sag point of the line to the highest point of: building (or structure) 3 m, telephone line 2 m, railway 8.5 m, fast road 12 m, public road 7 m, agricultural road 6.7 m. | m | Annex 11, Table 2 | Service guide, Annex 11, Table 2, PDF page 89 | 2026-11-11 | |
| K-04 | Vertical clearance for low voltage linesLow voltageMedium voltage | Lowest sag point of the line to the highest point of: building (or structure) 3 m, telephone line 1.2 m, railway 8.2 m, fast road 12 m, public road 6 m, agricultural road 5 m. | m | Annex 11, Table 2 | Service guide, Annex 11, Table 2, PDF page 89 | 2026-11-11 | |
| K-05 | Horizontal clearance for 69 kV linesLow voltageMedium voltage | From the pole centre line: building 6.3 m (to the nearest conductor), railway 25 m, fast road 18 m, ordinary or agricultural road 12 m. | m | Annex 11, Table 3 | Service guide, Annex 11, Table 3, PDF page 89 | 2026-11-11 | |
| K-06 | Horizontal clearance for 34.5/33 kV, 13.8 kV and low voltage linesLow voltageMedium voltage | From the pole centre line: building 2 m (to the nearest conductor), railway 15 m, fast road 15 m, ordinary or agricultural road 12 m. The same values apply at all three levels. | m | Annex 11, Table 3 | Service guide, Annex 11, Table 3, PDF page 89 | 2026-11-11 | |
| K-07 | Transmission line corridor widthTransmission | 110, 115 and 132 kV: 15 to 50 m depending on tower type. 230 kV: 35 to 56 m. 380 kV: 50 to 85 m. | m | Annex 11, Table 1 | Service guide, Annex 11, Table 1, PDF page 89 | 2026-11-11 |
Solar PV and renewable self-consumption (18)
Eligible sizes, meters, protection settings and connection duties for small-scale solar, and the self-consumption framework.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| S-01 | Interface protection: voltage default settingsLow voltageMedium voltage | Undervoltage 27<: 90% of nominal, 0.4 s. 27<<: 40%, 0.3 s. Overvoltage 59>: 110%, 3 s. 59>>: 120%, 0.2 s. Used only when the utility has not given other settings. | Annex B, Table 4 | SEC solar standard, Annex B, Table 4, PDF page 39 | 2026-11-11 | ||
| S-02 | Interface protection: frequency default settingsLow voltageMedium voltage | Overfrequency 81>>: 62.5 Hz, 0.1 s. Underfrequency 81<: 57.5 Hz, 1800 s. 81<<: 57 Hz, 30 s. | Annex B, Table 4 | SEC solar standard, Annex B, Table 4, PDF page 39 | 2026-11-11 | ||
| S-03 | Loss of mains protection: default settings and trip timeLow voltageMedium voltage | Vector shift 12 degrees and rate of change of frequency 2.5 Hz per second. Islanding must be detected and energising stopped within two seconds, unless the utility specifies otherwise. | 2 | s | Clause 6.9.4; Annex B, Table 5 | SEC solar standard, Clause 6.9.4, PDF page 25; Annex B, Table 5, PDF page 39 | 2026-11-11 |
| S-04 | Small solar systems up to 11 kWLow voltageMedium voltage | The interface protection and interface switch may be built into the inverter. Three-phase inverters are the rule; on the LV network single or two-phase inverters are permitted up to 11 kW. | 11 | kW | Clause 6.9.4 and 6.9.7.5 | SEC solar standard, Clause 6.9.4, PDF page 24; clause 6.9.7.5, PDF page 27 | 2026-11-11 |
| S-05 | Extra duties above 11 kWLow voltageMedium voltage | Low voltage ride through capability, a remote disconnection input, a remote active-power limitation input, bidirectional communication, and an uninterruptible supply for the interface protection. | 11 | kW | Clauses 6.6.1, 6.7.3, 6.9.2, 6.9.4, 6.9.5 | SEC solar standard, Clauses 6.6.1 (PDF page 16), 6.7.3 (page 19), 6.9.2 (page 23), 6.9.4 (page 24), 6.9.5 (page 26) | 2026-11-11 |
| S-06 | Backup switch above 20 kWLow voltageMedium voltage | The interface protection must also act on a second (backup) switch with a delay if the interface switch fails to open. After a backup trip only manual reclosure is possible. | 20 | kW | Clause 6.9.4 | SEC solar standard, Clause 6.9.4, PDF page 24 | 2026-11-11 |
| S-07 | Reactive power capability at full outputLow voltageMedium voltage | At rated active power, the inverter must reach a power factor of 0.95 in either direction (inductive or capacitive). | 0.95 | power factor | Clause 6.8.1, footnote 4 | SEC solar standard, Clause 6.8.1, footnote 4, PDF page 19 | 2026-11-11 |
| S-08 | Default reactive power settingLow voltageMedium voltage | The utility tells the owner which reactive power mode to use. If it does not specify, the default set point is cos phi 1 in fixed power factor mode (0 in fixed Q mode). In the power-related mode the defaults are cos phi 1 at zero and at half of nominal power, and 0.95 at nominal power. | 1 | cos phi | Clauses 6.8.2.1 and 6.8.2.2 | SEC solar standard, Clauses 6.8.2.1 (PDF page 20) and 6.8.2.2 (PDF page 21) | 2026-11-11 |
| S-09 | Active power response to over-frequencyLow voltageMedium voltage | Threshold settable at least between 60 and 62 Hz, default 60.2 Hz. Droop adjustable from 2% to 8%, default 3.83%. | 60.2 | Hz | Clause 6.7.1 | SEC solar standard, Clause 6.7.1, PDF page 17 | 2026-11-11 |
| S-10 | Capacity limit for one premises (small-scale solar PV)Low voltageMedium voltage | Not more than 2 MW and not less than 1 kW in one premises.Source: the Arabic text of the framework (ERD-TA-012, V02/19, Muharram 1442 H). The English wording is ours. | 1 to 2000 | kW | Clause 5-1(c) | Small-scale solar framework, Clause 5-1(c), PDF page 9 | 2026-11-11 |
| S-11 | Combined capacity limit for one consumerLow voltageMedium voltage | Not more than 5 MW in total across premises owned by the same eligible consumer in the supply area of one electricity department. | 5 | MW | Clause 5-1(d) | Small-scale solar framework, Clause 5-1(d), PDF page 9 | 2026-11-11 |
| S-12 | Solar capacity against contracted loadLow voltageMedium voltage | The maximum connected capacity of small solar systems in a premises must not exceed its contracted load.The 2023 self-consumption framework (clause 5.1 c) states the same rule for larger systems. | Clause 5-2 | Small-scale solar framework, Clause 5-2, PDF page 9 | 2026-11-11 | ||
| S-13 | Second meter for solar outputLow voltageMedium voltage | A second meter for the solar output is required when the system in one premises is above 100 kW. The utility supplies and installs it and the consumer bears its cost.The SEC solar standard (clause 6.10) repeats the 100 kW threshold. | 100 | kW | Clause 6(b) | Small-scale solar framework, Clause 6(b), PDF page 10 | 2026-11-11 |
| S-14 | Grid impact study thresholdLow voltageMedium voltage | Above 50 kW the distribution provider may ask for detailed planning data to run impact studies, and may reject a connection if the study shows it would cause problems on the network. The rejection must give reasons and the consumer must be given time to correct the situation. | 50 | kW | Clause 8-2-2 | Small-scale solar framework, Clause 8-2-2, PDF page 13 | 2026-11-11 |
| S-15 | Scope of the self-consumption frameworkLow voltageMedium voltage | Renewable generation systems above 1 kW and up to 30 MW for self-consumption on the premises, except solar PV up to 2 MW, which falls under the small-scale solar framework.Version 2 (June 2023) is an English translation of the Arabic original. The Arabic text prevails in case of conflict. | 30 | MW | Clauses 3.2 and 3.4 | Self-consumption framework, Clauses 3.2 and 3.4, PDF page 9 | 2026-11-11 |
| S-16 | Cap on total self-consumption capacity in a distribution areaLow voltageMedium voltage | Capacity connected under net billing on a provider's LV and MV networks must not exceed 3% of the previous year's peak load of its operating area. Approved requests above the cap wait until the next year. | 3 | % of previous-year peak load | Clauses 11.2.1 and 11.2.3 | Self-consumption framework, Clause 11.2.1, PDF page 18; clause 11.2.3, PDF page 19 | 2026-11-11 |
| S-17 | Storage added to a renewable systemLow voltageMedium voltage | Allowed if combined with the renewable system, if its power does not exceed the system's maximum connected capacity, if it serves on-site self-consumption, and if a grid-connected unit is run to reduce load-generation imbalance. | Clause 11.4.1 | Self-consumption framework, Clause 11.4.1, PDF page 19 | 2026-11-11 | ||
| S-18 | Time limits in the connection processLow voltageMedium voltage | The provider countersigns the connection agreement within 10 business days of receiving the signed copies and fees. It gives at least 2 days notice before inspecting a system. Re-inspection is agreed within 5 business days of the request. | 10, 2, 5 | days | Annex 3 clause 5.1(e); Annex 1 clauses 4-1, 4-2 | Self-consumption framework, Annex 3 clause 5.1(e), PDF page 30; Annex 1 clauses 4-1 and 4-2, PDF page 21 | 2026-11-11 |
Unit substation specification and SDMS numbers (15)
Ratings, sizes and test requirements of the utility's unit substation, and the SDMS numbers it cites.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| U-01 | Unit substation ratingsMedium voltageLow voltage | Nominal ratings 500, 1000 and 1500 kVA. MV side 13.8 kV or 36 kV. LV side 400/231 V.The title says "up to 36 kV". The dimension tables cover 13.8 kV and 36 kV only. SEC writes 400/231 V in this specification and 400/230 V in other documents, for example the transformer specification in row U-11. | 500, 1000, 1500 | kVA | Clause 7, Data Schedule 1, items 1 to 3 | SEC 56-SDMS-07, Clause 7, Data Schedule 1, items 1 to 3, PDF page 11 | 2026-11-11 |
| U-02 | What a unit substation containsMedium voltageLow voltage | A power transformer and an LV distribution panel in one transportable unit on a common skid. The MV switchgear and the ring main unit are not part of it. | Clauses 1 and 4.2.1.1 | SEC 56-SDMS-07, Clause 1, PDF page 3; clause 4.2.1.1, PDF page 4 | 2026-11-11 | ||
| U-03 | Neutral arrangementMedium voltageLow voltage | MV neutral solidly grounded or low resistance grounded. LV neutral solidly grounded. | Clause 4.1, Table 1 | SEC 56-SDMS-07, Clause 4.1, Table 1, PDF page 4 | 2026-11-11 | ||
| U-04 | Maximum overall size at 13.8 kVMedium voltageLow voltage | 500 kVA: 1800 x 1500 x 2200 mm. 1000 kVA: 2200 x 1500 x 2200 mm. 1500 kVA: 2400 x 1800 x 2200 mm (length x width x height, with enclosure). | mm | Clause 4.3.1, Table 2 | SEC 56-SDMS-07, Clause 4.3.1, Table 2, PDF page 7 | 2026-11-11 | |
| U-05 | Maximum overall size at 36 kVMedium voltageLow voltage | 500 kVA: 2000 x 1500 x 2200 mm. 1000 kVA: 2300 x 1700 x 2200 mm. 1500 kVA: 2400 x 1900 x 2200 mm. | mm | Clause 4.3.2, Table 3 | SEC 56-SDMS-07, Clause 4.3.2, Table 3, PDF page 7 | 2026-11-11 | |
| U-06 | Main circuit breaker ratings in the LV panelLow voltage | Main circuit breaker 800 A, 1600 A or 2500 A. Number of distribution units 6, 12 or 14.The schedule does not say which breaker rating goes with which kVA rating. The specification refers to 31-SDMS-07 for other details such as the number of outgoing circuits and bus-bar sizes. | 800, 1600, 2500 | A | Clause 7, Data Schedule 1, items 4 and 5 | SEC 56-SDMS-07, Clause 7, Data Schedule 1, items 4 and 5, PDF page 11 | 2026-11-11 |
| U-07 | Enclosure degree of protectionMedium voltageLow voltage | IP54 for the LV compartment (type tested to IEC 60529) and for the MV termination box. | 54 | IP | Clauses 4.2.2.7 and 5.1 | SEC 56-SDMS-07, Clause 4.2.2.7, PDF page 6; clause 5.1, PDF page 9 | 2026-11-11 |
| U-08 | Enclosure sheet thickness and finishMedium voltageLow voltage | MV termination box and LV compartment in galvanized sheet steel at least 3 mm thick, or Alum-zinc at least 2 mm. Finish colour RAL 7035. | 3, 2 | mm | Clauses 4.2.1.2 and 4.6.2 | SEC 56-SDMS-07, Clause 4.2.1.2, PDF page 4; clause 4.6.2, PDF page 8 | 2026-11-11 |
| U-09 | Internal arc test of the transformer cable boxMedium voltage | 16 kA for 0.3 seconds. | 16 | kA for 0.3 s | Clause 7, Data Schedule 2, item 4.7 | SEC 56-SDMS-07, Clause 7, Data Schedule 2, item 4.7, PDF page 12 | 2026-11-11 |
| U-10 | Provision for mobile generator cablesLow voltage | One 250 x 250 mm gasketed opening on the LV door. 13 mm holes on the bus-bars: 2 per phase and 1 on neutral for 500 kVA, 4 per phase and 2 on neutral for 1000 and 1500 kVA. | 13 | mm | Clause 4.5 and Data Schedule 2 | SEC 56-SDMS-07, Clause 4.5 and Data Schedule 2, PDF page 8 | 2026-11-11 |
| U-11 | SDMS 51-SDMS-03Medium voltage | Distribution transformer up to 36 kV, 400/230 V, with aluminium windings. | Clause 3.1 | SEC 56-SDMS-07, Clause 3.1, PDF page 3 | 2026-11-11 | ||
| U-12 | SDMS 31-SDMS-07 and 31-SDMS-08Low voltage | 31-SDMS-07: dual LV distribution panel with aluminium bus-bar, main circuit breaker and outgoing MCCBs. The LV compartment must comply with 31-SDMS-08, which also covers name plates and circuit labels (clauses 4.7 and 4.8). In a conflict with 31-SDMS-07, "this specification" applies; the clause does not say whether that means 56-SDMS-07 or 31-SDMS-08.The sentence says "this specification" without saying which one; both readings are possible. | Clauses 3.2, 4.2.3.1 | SEC 56-SDMS-07, Clause 3.2, PDF page 3; clause 4.2.3.1, PDF page 6; clauses 4.7 and 4.8, PDF page 8 | 2026-11-11 | ||
| U-13 | SDMS 37-SDMS-02 and 37-SDMS-04Low voltage | 37-SDMS-02: LV molded case circuit breakers for LV distribution panels, 400 A. 37-SDMS-04: interface low voltage main circuit breakers. | Clauses 3.3 and 3.4 | SEC 56-SDMS-07, Clauses 3.3 and 3.4, PDF page 3 | 2026-11-11 | ||
| U-14 | SDMS 11-SDMS-03, 12-SDMS-01, 12-SDMS-02Medium voltage | 11-SDMS-03: XLPE insulated power cables from 15 kV up to 36 kV. 12-SDMS-01: cable joints, terminations and accessories up to 36 kV. 12-SDMS-02: lugs and connectors for MV and LV distribution systems. | Clauses 3.5, 3.8, 3.9 | SEC 56-SDMS-07, Clauses 3.5 and 3.8, PDF page 3; clause 3.9, PDF page 4 | 2026-11-11 | ||
| U-15 | SDMS 50-SDMS-01, 38-SDMS-03, 40-SDMS-02AMedium voltageLow voltage | 50-SDMS-01: current transformers up to 36 kV. 38-SDMS-03: LV digital panel meters. 40-SDMS-02A: electronic revenue CT and CT-VT meter. | Clauses 3.10, 3.12, 3.13 | SEC 56-SDMS-07, Clauses 3.10, 3.12, 3.13, PDF page 4 | 2026-11-11 |
Site service conditions (5)
Temperature, altitude, humidity, wind, soil and enclosure protection assumed for equipment in the Kingdom.
| ID | Requirement | Value | Number | Unit | Clause | Source | Verified |
|---|---|---|---|---|---|---|---|
| N-01 | Outdoor ambient temperature for equipmentLow voltageMedium voltage | Minimum -5 degrees C, maximum 55 degrees C, hottest-month average 40 degrees C, yearly average 30 degrees C. | 55 | °C max | Annex D | SEC solar standard, Annex D, PDF page 42 | 2026-11-11 |
| N-02 | Indoor ambient temperatureLow voltageMedium voltage | 25 degrees C in air-conditioned buildings. 40 degrees C in buildings with no air conditioning. | 25, 40 | °C | Annex D | SEC solar standard, Annex D, PDF page 42 | 2026-11-11 |
| N-03 | Soil thermal resistivity for cable sizingLow voltageMedium voltage | 2.0 degrees C metre per watt at one metre depth and below. | 2.0 | °C.m/W | Annex D | SEC solar standard, Annex D, PDF page 42 | 2026-11-11 |
| N-04 | Altitude, humidity and windLow voltageMedium voltage | Altitude up to 1000 m is normal. Maximum relative humidity 100%. Maximum wind velocity 150 km/h. Average annual rainfall 150 mm. | 1000, 100, 150 | m, %, km/h | Annex D | SEC solar standard, Annex D, PDF page 42 | 2026-11-11 |
| N-05 | Minimum enclosure protection degreeLow voltageMedium voltage | Outdoor equipment IP54 at least, weatherproof and corrosion resistant. Indoor equipment IP41. | 54, 41 | IP | Annex D, note 2 | SEC solar standard, Annex D, note 2, PDF page 43 | 2026-11-11 |
Sources
- The Saudi Arabian Grid CodePublisher: Saudi Electricity Regulatory Authority (SERA). Version: Updated version: May 2024Checked copyOfficial addressChecked copy: Internet Archive capture of 28 November 2025. sera.gov.sa did not answer from our network on 2026-11-11. Arabic wording of rows is our translation of the English text. No official Arabic title of this English document was found, so the Arabic name is a plain descriptive one (the service guide calls the transmission code الكود السعودي لنقل الكهرباء).
- Electricity Service Provision Guide (Arabic edition)Publisher: Saudi Electricity Regulatory Authority (SERA). Version: 8th edition, Jumada al-Awwal 1444 HChecked copyOfficial addressChecked copy: Internet Archive capture of 11 September 2025. The Arabic text was read; the English wording of rows is ours.
- Regulatory Framework for Small-Scale Solar PV Systems, ERD-TA-012 (V02/19), Arabic editionPublisher: Saudi Electricity Regulatory Authority (SERA). Version: Version 2, Muharram 1442 HChecked copyOfficial addressChecked copy: Internet Archive capture of 2 May 2025. The Arabic text was read; the English wording of rows is ours.
- Regulatory Framework for Renewable Energy Generation for Self-Consumption, ERD-TA-004 (V02/23)Publisher: Saudi Electricity Regulatory Authority (SERA). Version: Version 2, June 2023Checked copyOfficial addressChecked copy: Internet Archive capture of 4 April 2025. The English text is a translation by SERA of the Arabic original, which prevails. Arabic wording of rows is our translation of the English.
- Technical Standards for the Connection of Small-Scale Solar PV Systems to the LV and MV Distribution Networks of SECPublisher: Saudi Electricity Company (SEC). Version: Version 3.2, 3 March 2020Checked copyOfficial addressRead directly on SEC's own host on 2026-11-11, which opens from outside Saudi Arabia. The file name says v312 and the cover says Version 3.2. Arabic wording of rows is our translation; SEC publishes the document in English.
- SEC Distribution Materials Specification 56-SDMS-07 Rev.02: Unit Substations up to 36 kV, Aluminum Transformer, Aluminum Bus Bars LVDP with Main Circuit Breaker and Outgoing MCCBsPublisher: Saudi Electricity Company (SEC). Version: Rev.02, issue date 03/2023Checked copyOfficial addressRead directly on SEC's own host on 2026-11-11, which opens from outside Saudi Arabia. Page numbers in the PDF run to 15 although its footer says "of 17". Arabic wording of rows is our translation.
Method and limits
Sources. The Saudi Arabian Grid Code (updated May 2024), the SERA Electricity Service Provision Guide (8th edition, in Arabic), the SERA Regulatory Framework for Small-Scale Solar PV Systems (Arabic edition, version 2), the SERA Regulatory Framework for Renewable Energy Generation for Self-Consumption (version 2, June 2023), and two SEC documents: the small-scale solar connection standard (version 3.2) and material specification 56-SDMS-07 (Rev.02, March 2023). Nothing here comes from a private or paid source.
How each row was checked. Rows were extracted from the source with a verbatim quote, the page and the clause. For English sources the quote was matched automatically against the text of the PDF. Tables, and every row from the Arabic guide and the Arabic solar framework, were read from rendered page images. The date in the Verified column is the date the source was read for that row.
Arabic. Rows from the two Arabic originals use the wording of the official Arabic text, and the English is ours. Rows from English documents carry our Arabic translation, written for a Saudi engineer and using the terms of the official Arabic documents. For the self-consumption framework the English is a translation by the regulator and the Arabic text prevails.
Links. sera.gov.sa did not answer from our network on 2026-11-11, so SERA rows link to Internet Archive captures of the official files. The capture date is in each link, and the Sources list gives the official address. SEC's own host, se.com.sa, opened, so rows from the SEC solar standard and 56-SDMS-07 link to SEC directly.Page numbers are PDF page numbers, not printed ones.
What is left out. Consumption tariffs, connection charges, service fees and the reactive power tariff are left out of this dataset, as are all amounts of money. SERA publishes them in the annexes of its service guide (consumption tariff, connection charge and service fees) and on sera.gov.sa. The Saudi Arabian Distribution Code is not covered: we could not open an official copy for this version, and the numeric power factor limit of clause DPC2.4 and the harmonic planning levels of clause DPC2.3 are in it. The solar and EV standards point to those clauses and rows Q-07 and Q-08 say so. EV charging rules are left out of version 1.0: the SEC charging standard and the regulator's charging framework could only be found on a third-party host, and no official-host copy could be opened. The guide also carries load tables for 220 V supplies, which this version does not list. The SEC specifications listed are the ones cited by 56-SDMS-07, not the full SDMS list.
Limits. This is a reference. It is not legal advice and it is not a SERA or SEC publication. SERA and SEC can amend a code, framework or specification at any time, and the SEC standards say a later edition supersedes them. Read the current official text before you design, file or build.
Corrections. If you find an error, write to info@nlspower.com with the row ID. Corrections are dated and the version number goes up.
Frequently Asked Questions
What are the low-voltage supply levels in Saudi Arabia?+
SEC's solar standard lists 400/230 V, 380/220 V and 220/127 V as low-voltage levels (clause 4, row V-01) and three configurations, led by three-phase four-wire 400/230 V (Annex C, row V-05). The Grid Code gives the nominal frequency as 60 Hz for the transmission system (clause 2.4.2.1, row V-04). A 220/127 V supply upgraded to 400/230 V leaves 127 V single-phase inverters unusable (clause 6.9.7.5, row V-06).
How much can voltage and frequency vary on a Saudi supply?+
SEC's solar standard, quoting the Distribution Code, gives plus or minus 5% under normal operating conditions, which is 380 to 420 V at 400/230 V (Table 3, row F-06). On the transmission grid the Grid Code keeps frequency between 59.9 and 60.1 Hz (clause 2.4.2.1, row F-01). Solar systems must stay connected from 90 to 110% of nominal voltage (clause 6.5, row F-10).
What power factor does the Grid Code set for large customers?+
Clause 2.5.6.4 (row Q-05) says distribution entities and directly connected customers with contracted load above 1.0 MVA should take all precautionary measures to maintain 85% lagging. Their minimum allowable power factor will be 90% lagging after five years and 95% lagging after ten years from 21-10-1433. The numeric limit for other sites on the distribution network is in clause DPC2.4 of the Distribution Code, which this dataset does not cover (row Q-07). Tariff amounts are left out.
At what load is supply at medium voltage, and when must I provide a substation room?+
The SERA service guide supplies loads up to 4 MVA at low voltage and loads above 4 MVA up to 25 MVA at medium voltage (Article 11, rows C-02 and C-03). The customer provides a substation site inside the plot when the load for the built area exceeds 166 kVA, with no more than 20 m2 per transformer (clause 11-1-7, rows C-06 and C-07).
What are the limits for small-scale solar PV on a Saudi site?+
One premises may host 1 kW up to 2 MW (clause 5-1 c, row S-10), and a consumer may not exceed 5 MW combined in one electricity department area (row S-11). Capacity may not exceed contracted load (row S-12). Above 100 kW a second meter is needed (row S-13). Above 11 kW SEC requires ride-through and remote disconnection, and above 20 kW a backup switch (rows S-05 and S-06).
What ratings and sizes does an SEC unit (package) substation come in?+
SEC specification 56-SDMS-07 covers 500, 1000 and 1500 kVA units at 13.8 kV or 36 kV with a 400/231 V secondary (clause 7, row U-01). A 13.8 kV unit of 1000 kVA is at most 2200 x 1500 x 2200 mm (Table 2, row U-04). The LV compartment is IP54 (row U-07), and the unit does not include MV switchgear (row U-02).